For those who are using ISP Streamyx is having slow connection due to detected a Cable fault on the Southeast Asia-Middle East-Western Europe 4 (SMW4) submarine cable network between Alexandria in Egypt and Palermo in Italy linking Malaysia to Europe and the United States (US). The consortium will be carrying out repair works on site on Saturday, 24 April 2010 and it is expected to be completed on Sunday, 2nd May 2010.
Sorry for the inconvenience.
This post first appeared on Malaysia Property Blog » Malaysia Online Classifi, please read the originial post: here