Get Even More Visitors To Your Blog, Upgrade To A Business Listing >>

Oracle APPS :BOM interfaces Validations

The INVENTORY_ITEM_ID in the MTL_SYSTEM_ITEMS table is system generated. It is the same number as the ASSEMBLY_ITEM_ID in the BOM_BILL_OF_MTLS_INTERFACE the COMPONENT_ITEM_ID in the BOM_INVENTORY_COMPS_INTERFACE table and the SUBSTITUTE_COMPONENT_ID in the BOM_SUB_COMPS_INTERFACE.


The ASSEMBLY_ITEM_ID in the BOM_BILL_OF_MTLS_INTERFACE table is the same number as the ASSEMBLY_ITEM_ID in the BOM_INVENTORY_COMPS_INTERFACE, the
BOM_OP_RESOURCES_INTERFACE, the BOM_OP_SEQUENCES_INTERFACE, and the
BOM_OP_ROUTINGS_INTERFACE tables.

The BILL_SEQUENCE_ID in the BOM_BILL_OF_MTLS_INTERFACE table is system generated. It is the same number as the BILL_SEQUENCE_ID in the BOM_INVENTORY_COMPS_INTERFACE table.

The COMPONENT_SEQUENCE_ID in the BOM_INVENTORY_COMPS table is system generated.The ROUTING_SEQUENCE_ID in the BOM_OP_ROUTINGS_INTERFACE table is the same in the BOM_OP_RESOURCES_INTERFACE and the BOM_OP_SEQUENCES_INTERFACE tables.
The OPERATION_SEQUENCE_ID in the BOM_OP_SEQUENCES_INTERFACE table is the same in the BOM_OP_RESOURCES_INTERFACE table.

If you enter the ORGANIZATION_CODE, Oracle Bills of Materials will fill in the corresponding
ORGANIZATION_ID.

  • If you enter the ITEM_NUMBER, Oracle Bills of Materials will fill in the corresponding ASSEMBLY_ITEM_ID.
  • If you enter the LOCATION_NAME , Oracle Bills of Materials will fill in the corresponding SUPPLY_LOCATOR_ID
  • If you enter the ASSEMBLY_ITEM_NUMBER, Oracle Bills of Materials will fill in the corresponding ASSEMBLY_ITEM_ID.
  • If you enter the SUBSTITUTE_COMP_NUMBER , Oracle Bills of Materials will fill in the corresponding SUBSTITUTE_COMP_ID.
  • If you enter the COMPONENT_ITEM_NUMBER, Oracle Bills of Materials will fill in the corresponding COMPONENT_ITEM_ID.


  1. You can enter the BILL_SEQUENCE_ID, COMPONENT_ITEM_ID, OPERATION_SEQ_NUM, and EFFECTIVITY_DATE instead of COMPONENT_SEQUENCE_ID. The open interfaces will fill in the corresponding COMPONENT_SEQUENCE_ID.
  2. You can enter ASSEMBLY_ITEM_ID, ORGANIZATION_ID, and ALTERNATE_BOM_DESIGNATOR  instead of BILL_SEQUENCE_ID. The open interfaces will fill in the corresponding BILL_SEQUENCE_ID.
  3. You can enter ASSEMBLY_ITEM_ID, ORGANIZATION_ID, AND ALTERNATE_ROUTING_DESIGNATOR instead of ROUTING_SEQUENCE_ID. Oracle Bills of Material  will fill in the corresponding ROUTING_SEQUENCE_ID.
  4. You can enter ROUTING_SEQUENCE_ID, OPERATION_SEQ_NUM, and EFFECTIVITY_DATE instead of  OPERATION_SEQUENCE_ID. Oracle Bills of Materials will fill in the corresponding OPERATION_SEQUENCE_ID.




This post first appeared on EBiz Integration Technics, please read the originial post: here

Share the post

Oracle APPS :BOM interfaces Validations

×

Subscribe to Ebiz Integration Technics

Get updates delivered right to your inbox!

Thank you for your subscription

×