Get Even More Visitors To Your Blog, Upgrade To A Business Listing >>

Pine Hill FD Structure Fire 130 Preston rd

** Cheektowaga NY **
Pine Hill Chief on scene 2 story dwelling. Heavy smoke showing and fire from exterior porch area. Attack crews knocked down exterior and then advanced line interior to check for extension. Back up line continued to put water on from exterior. No extension into house. Fire caused by careless use of fireworks.
2 – 1¾” Lines in use
ON Scene:
Pine Hill: Truck6, Engine 2 & Utility 5
Sloan: Engine1; Rescue: Engine 1; Cleve Hill: Engine 3
Hy-View: Truck 6; U-Crest: Rescue 7
Snyder RIT: Rescue 7 & Forks Engine stood by at Pine Hill
Damages: $ 10K
5-27-2020 – Time Out: 21:34 hrs



This post first appeared on Firefighter Spot | Home Of The Best Firefighting V, please read the originial post: here

Share the post

Pine Hill FD Structure Fire 130 Preston rd

×

Subscribe to Firefighter Spot | Home Of The Best Firefighting V

Get updates delivered right to your inbox!

Thank you for your subscription

×