Get Even More Visitors To Your Blog, Upgrade To A Business Listing >>

All You Need To Know About The All New Olympic House In Lausanne

Lausanne recently got its new Olympic house names after the 3XN’s Olympic house and the city had a celebration time for this amazing construction. Since a long time the construction was going on and on the auspicious day of the international Olympic day celebration, the inauguration of this beautiful Olympic House took place which done by the international Olympic committee.

Source: igsmag.com

Source: architectenweb.nl

This headquarter is said to be modern and has better facilities as compared to the old one and this construction exactly took place in Lausanne which comes under Switzerland. The construction of this Olympic headquarter was done by the 3XN architectural firm and that is the reason that this new Olympic house is known by the name of 3XN.

Also Read: The List Of The Biggest Stadium In The World

The idea or you can say the aim behind the construction of this Olympic house was to bring the international Olympic committee staffs together and also they wanted to bring the 500 Olympic employees under a single rooftop as the previous staff had to work in different places in the Lausanne city which seems to be quite tough so this construction seems to be beneficial for the staffs as well which is a great thing for sure.

Source: zhuxuncn.com

Source: dezeen.com

Apart from this aim of bringing every single person associated with Olympic of Switzerland together, they also thought of future use of the area and it can be said that the new Olympic building would provide with better opportunities for the employees as well as for the country. Olympic is no doubt one of the biggest game tournament worldwide so it has to be grand and when it comes to the Olympic headquarter, it has to be grand as well. 

Source: kmgram.com

Source: googleusercontent.com

It was the year 2014 when the International Olympic Committee decided to bring up the development for Olympics so the decision of making the new Olympic house was taken. 3XN’s selection was not easy at all rather they were selected by a grand architectural competition and they had to win the competition for being a part of the construction of the Olympic house.

Source: intern magazine.it

Source: roadster.hu

The 3XN team was not the alone team to lead the construction of the Olympic house rather Swiss architecture firm from IttenBrechbuhl was also selected and had an equal contribution in the construction of this new Olympic house of Lausanne and it can be said that both the teams worked really well to come up with such amazing construction. The international Olympic committee had some points to brief the architectural teams and based on those briefs, this Olympic headquarter was formed.

Source: worldarchitecture.org

Source: dezeen.com

The main objectives of this Olympic house were transparency, movement, collaboration, sustainability as well as flexibility and all of these objectives has direct links with the Olympic games rather these objectives on the long run would help in the betterment of the Olympic games of the place. The Temporary Structures of this building was awesome. The building construction was done in such a way that it could be perfect for the Olympic games of the place. Now coming to the building itself, you would see that it seems like a designer broad structure which has reflective mirror allover which beautified the building. The surrounding of the building is not crowded rather you would be able to see greenery as well as huge trees around the building which is a great thing for sure.

Source: qq.com

Source: archinect.com

Source: news-world.biz

It is a huge building which has got lots of halls and sections inside and the interior of the building seems to be of a different level. The co-founder of the 3XN architectural company stated that the construction of this building was not about good presentation but it was more about understanding the purpose and serving the best so that the Olympic work could not be hampered in any way. You would be amazed to know that this building has already named three sustainable building certificates making it the most sustainable building of the time. These were everything that you need to know about the Olympic House in Lausanne and for more such amazing information you can stick to Architecturesideas.



This post first appeared on , please read the originial post: here

Share the post

All You Need To Know About The All New Olympic House In Lausanne

×

Subscribe to

Get updates delivered right to your inbox!

Thank you for your subscription

×