If you are laying over a Concrete Subfloor you will first need checked the concrete moisture, if the floor has a moisture content of over 4% then either wait until the sub floor dries to meet this level or use … Continue reading →
This post first appeared on Hardwood Floor Installation Tips And Tricks, please read the originial post: here