Amendment Slip No.-74, dated- 03.10.2022 to the G&SR of NCR01 Existing SR 4.10/2 is deleted and substituted as under- (A/Slip No.-74)SR 4.10/2 Following precautionary conditions must be… Read More
Terminology used in a Caution Order with their Meanings1. O.E.S. – OBEY ENGINEERING SIGNAL2. C.T.R. – COMPLETE TRACK RENEWAL3. T.R.R. – THROUGH RAIL RENEWAL4. L.W.R. &ndas&hell…Read More