Get Even More Visitors To Your Blog, Upgrade To A Business Listing >>

The Michigan Thumb Loop Transmission Line – 140 Miles of Energetic History For Green Energy

The Thumb Loop project will be the base of transmission system designed to meet the identified maximum wind energy potential of the Thumb region.


This post first appeared on ThumbWind | Michigan's Upper Thumb, please read the originial post: here

Share the post

The Michigan Thumb Loop Transmission Line – 140 Miles of Energetic History For Green Energy

×

Subscribe to Thumbwind | Michigan's Upper Thumb

Get updates delivered right to your inbox!

Thank you for your subscription

×