Get Even More Visitors To Your Blog, Upgrade To A Business Listing >>

How To Install Engineered Hardwood Flooring?

Engineered Hardwood floor is a durable and timeless addition to any home. You should know that it is one of the best investments and has a pretty good resale value too. Many other hardwood floor trends will come and go, but Engineered Hardwood floor is everlasting.

If you plan to install engineered hardwood floors by yourself, you will need proper guidance at every step. And that’s where we step in. This step-by-step guide will walk you through the installation process, providing valuable insights and tips to ensure a successful and professional outcome. We’ve got you covered- from preparing the subfloor to laying down the planks and finishing touches. Get ready to transform your space with the eternal beauty and functionality of Engineered Hardwood Flooring.

Take a break from whatever you’re doing and read our guide about installing engineered hardwood floors and several other crucial details.

Table of Contents

Engineered Hardwood Flooring- What Is It?

Do you know about the newest fad in the hardwood flooring world? Engineered hardwood is the trendiest and is a great substitute for solid wood flooring.

Engineered hardwood flooring is a type of flooring that combines the beauty of real wood with enhanced durability and versatility. It is made of multiple layers, typically consisting of a thin veneer of wood on top, bonded to several layers of high-quality plywood or fiberboard beneath. This construction gives engineered hardwood flooring its strength and stability, making it less prone to warping or shrinking than solid hardwood floors.

The top or wear layer can be made from many wood species, allowing for several styles and finishes to suit different design preferences. Engineered hardwood flooring provides the timeless elegance of hardwood while offering increased resistance to moisture and temperature fluctuations. This makes it suitable for engineered hardwood flooring installation in areas where traditional solid hardwood is not recommended.

What Are The Different Types of Engineered Hardwood Floors?

Engineered hardwood floors are a popular choice for homeowners due to their durability and aesthetic appeal. They are made by layering multiple thin sheets of wood, called veneers, together with a top layer of hardwood. If you have decided to go for engineered hardwood floor installation for your home or another area, you also need to know the variety they have.

Here are the three main types of engineered hardwood floors based on their construction and finish

1. Plywood Core:

This engineered hardwood has a plywood core, typically made from layers of thin sheets of wood glued together. The hardwood veneer is then attached to the top surface. Plywood core-engineered hardwood is known for its strength and stability.

2. High-Density Fiberboard (HDF) Core:

In this type, the core has high-density fiberboard created by compressing wood fibers with resin under high pressure. HDF core-engineered hardwood is dense, durable, and resistant to moisture.

3. Cross-Laminated Core:

Cross-laminated engineered hardwood consists of multiple layers of wood veneers that are cross-aligned and glued together. This construction enhances stability and reduces the likelihood of warping or cupping.

Apart from the above, there are many others like stained or color finish, hard-scraped finish, wire-brush finish, smooth finish engineered hardwood floor. There is also rotary-cut veneer and slice-face veneer for you. Choose anyone for installing engineered hardwood floors, or take expert help to guide you on how to choose hardwood flooring.

When Do You Install Engineered Hardwood Flooring?

When one asks about the best time for engineered hardwood flooring installation, we of course wouldn’t mention a specific time of the year. But if want to install it for your kitchen, stairs, or any other area, here’s what we have for you-

For optimal results and to minimize potential damage, we recommend installing engineered hardwood flooring after completing all drywall, plumbing, painting, and electrical work. Before installation, acclimate the engineered hardwood flooring to the room for a minimum of 72 hours.

It is important to maintain a relative humidity level of 30 to 50% and a temperature range of 60 to 80 Fahrenheit. It’s worth noting that certain activities, such as drywall and paint work can significantly increase the humidity in a room.

If you plan to install the engineered hardwood flooring over a concrete subfloor, allow the concrete to cure for at least 60 days before proceeding with the installation. This curing period ensures the stability and readiness of the concrete subfloor. And while there are four main methods for installing engineered hardwood flooring, whichever method you opt for, do a lot of planning and prepping.

The Safety Considerations For Installing Engineered Hardwood Planks

When installing wood planks, you think about the safety aspect too. There may be times when you hurt yourself, or an unknowing accident takes place. Here are a few safety measures you have to take when and before installing the hardwood plank-

1. Personal Protective Equipment (PPE):

Wear appropriate PPE, such as safety goggles, gloves, and knee pads, to protect yourself from potential hazards during installation. Safety glasses are essential to shield your eyes from flying debris, and gloves will protect your hands while handling tools and materials.

2. Proper Handling and Lifting Techniques:

Engineered hardwood planks can be heavy, so use proper lifting techniques to avoid back strain or injury. Lift with your legs, not your back, and ask for assistance if needed. Also, be cautious when transporting and maneuvering the planks to prevent tripping hazards or accidental falls.

3. Tool Safety:

Ensure that all tools you use are in good working condition and appropriate for the task. Follow the manufacturer’s instructions and safety guidelines for each tool. Keep cutting tools, such as saws or power tools, away from the reach of children or unauthorized individuals.

4. Hazardous Materials:

Be aware of any hazardous materials used during installation, such as adhesives, finishes, or cleaning solutions. Follow the manufacturer’s instructions and guidelines for handling and disposing of these materials safely. Keep them out of reach of children and pets.

5. Ventilation:

Ensure adequate ventilation in the installation area, especially if you’re using adhesives or finishes. Proper ventilation helps dissipate fumes and prevents the accumulation of potentially harmful airborne particles.

6. Slip and Fall Prevention:

Keep the work area clean and free from debris. Remove all obstacles or tripping hazards, such as cords or tools from walkways. Consider using slip-resistant footwear to maintain stability during installation.

7. Electrical Safety:

If your installation involves electrical tools or equipment, take precautions to prevent electrical hazards. Ensure that all electrical connections are properly grounded; avoid using damaged cords, and follow electrical safety guidelines to minimize the risk of electrical shocks or fires.

8. Read and Follow Installation Guidelines:

Familiarize yourself with the manufacturer’s installation guidelines for specific engineered hardwood products you use. Adhere to their recommendations regarding acclimation, installation methods, and environmental conditions to ensure a safe and successful installation.

Remember, it’s always essential to prioritize safety during any construction or installation project. If unsure about any aspect of the installation process, consult a professional or seek guidance from the manufacturer.

Know How To Cut Engineered Hardwood Planks

Before the installation, you need to learn how to cut the planks. It is an important part of the wood plank fitting process. Fortunately, with the correct equipment, it becomes a simple practice. We’ll let you know how it’s done-

1. Collect Necessary Tools

You’ll need a circular saw, or a miter saw with a fine-toothed blade, a tape measure, a straightedge or square, a pencil, and safety equipment such as safety goggles and ear protection. You don’t want dust and noise damaging yourself, right?

2. Measurement and Marking

Precise measurement and marking is the most important part of cutting the plank. Even half an inch may create havoc in the installation process. Therefore, measure the length you need to cut on the plank and mark it with a pencil. Double-check your measurements to ensure accuracy.

3. Have A Cutting Corner

You need a proper area that is spacey and supportive for you. Have a stable work surface, such as a sawhorse or a sturdy table. Make sure you have adequate support underneath the plank to prevent splintering.

4. Choose Your Saw

A suitable saw makes a lot of difference while cutting the planks. We have seen many individuals create bad cuts because of improper saw use. If you are using the circular saw, adjust the blade depth to slightly deeper than the thickness of the engineered hardwood plank. This will help prevent splintering. If you’re using a miter saw, adjust the blade angle and height according to your desired cut. If you still have difficulties, call the experts.

5. Making The Cut And Checking

It’s time to cut the planks. Are you ready? Position the plank securely and align the marked line with the saw blade. Hold the plank firmly in place and activate the saw. Slowly guide the saw along the marked line, applying gentle and consistent pressure. Let the saw do the cutting without forcing it. Be careful that your fingers are clear of the blade at all times. Once the cut is complete, inspect the edge of the plank for any splintering or roughness. If necessary, use sandpaper or a file to smooth out the edges.

6. Repeat Process

Since you’ll have numerous planks to cut, repeat the process. Continue measuring, marking, and cutting each plank to fit your installation area. Remember to measure twice and cut once to minimize errors.

7. Installing The Planks

Finally, the installation time comes. Once the planks are cut to size, follow the manufacturer’s instructions for installing engineered hardwood flooring. It typically involves applying adhesive or using a click-lock or tongue-and-groove installation method. Do not do anything experimental unless you have experience in this field. We advise you to stick to the instruction manual.

Use this method to cut as much plank with great precision and wear the safety gear. And if you have difficulties, it’s safe to call professionals to help you.

The Preparation For Engineered Wood Floor Installation

When you learn how to lay an engineered hardwood floor, you have to consider the kind of floor you are installing. Different types of engineered flooring may have a click system with varying mechanisms, or they may have tongue and groove profiles that require nailing or gluing down. However, regardless of the specific method, there are essential installation requirements that you should follow accurately.

This guide on laying engineered wood flooring will help you avoid common mistakes frequently made by flooring installers. Let’s get into it-

Recommended items-

  • Moisture Metre
  • Ear and eye protection gear
  • Knee Pads
  • Spacers
  • Electric Chop Saw (to replace the hand saw)
  • Pull Bar
  • Jig-saw
  • 2m Long Spirit Level
  • Spacers
  • Measuring Tape

Site Requirements

Before the installation process, check the site conditions. It is an important step to clean the area from dust, oil, or any other residue. Cleaning prevents from having stains while you apply the finish. Being in this field for a long time, we have heard horror stories of wood floors having splits, gaps, creaks, etc. These problems happen due to reactions in improper site conditions like pressure or movement.

Before you start your work, make sure the site is suitable by carrying out a few tests. If you have hired a professional wood floor installer, they are responsible for conducting these tests. In case any of the tests fail, it is crucial to investigate the cause and find a solution to resolve the issue. This is necessary to ensure the wood flooring is delivered to the site safely. You should check for the essentials like humidity percentage, moisture content tests for timber-based and concrete subfloors, and subfloor leveling.

Checking Floors And Acclimatization

Once receiving the planks, check for acclimatization. You should open the pack very carefully, and check the finish and color. Before proceeding with the installation, it is crucial to verify the accuracy of the flooring, as most suppliers typically do not offer replacements once the wood floor has been installed.

It’s important to note that different batches of wood flooring can exhibit variations in color and texture, as wood is a natural material with inherent color differences. Additionally, each batch may be produced using different manufacturing lines. If you are content with the engineered hardwood flooring, securely reseal the box to allow it to acclimate appropriately.

It takes around six to seven days to acclimatize the floor. You should leave 4 cm between all the piles for air circulation.

To acclimate engineered wood flooring for under-floor heating, follow these steps:

  • Lay each box of flooring individually on the ground.
  • Start the heating system at a low, comfortable heat setting.
  • Increase the heat by 2 degrees every 2 days until reaching the highest setting you’ll use.
  • Reduce the heat by 2 degrees every 2 days until reaching the lowest comfortable level.
  • Maintain this process for at least 2 weeks to properly acclimate the engineered floor for under-floor heating.

The Subfloor

It takes time to acclimate the subfloor. You have to look into several aspects. Follow these simple steps and get started-

  • Remove baseboards
  • Remove old staples and nails
  • Clean the subfloor
  • Check the level
  • Repair any damages
  • Moisture test

By properly preparing the subfloor, you create a solid foundation for the installation of the engineered wood flooring. This helps ensure a successful and long-lasting result.

Underlayment

Here’s a small tip for you- always install the engineered wood on top of an underlayment.

Incorporating an underlayment provides several benefits, such as moisture resistance, thermal insulation, noise reduction, and the ability to conceal minor subfloor flaws. By employing this additional layer of support beneath your floors, you can extend the durability and longevity of your engineered wood planks.

Different Methods And The Steps To Install Engineered Hardwood Floors

Now that you know how to be prepared for the installation, let’s focus on the different kinds of hardwood floor fitting. When it comes to installing engineered hardwood flooring, there are various methods available to achieve a secure and visually appealing result. The choice of installation method depends on factors such as the type of hardwood, subfloor conditions, and personal preferences. Some common types of hardwood floor fitting methods include nail-down, glue-down, floating, and staple-down. Understanding these different methods can help you choose the most suitable approach for your hardwood flooring project. So let’s dive into it!

Method 1: Floating Floor Installation

One of the most prevalent methods for installing engineered hardwood is the floating floor installation. This process entails inserting the tongue of one plank into the groove of another and securely locking them together. To know how to fit floating engineered hardwood, you should first know that it typically requires only the planks. In some cases, you can use tongue and groove glue depending on the specific flooring requirements.

Tools Required-

  • Glasses
  • Tape to measure
  • Tapping block
  • 1/4″ spacers
  • Pen
  • Table saw or tile cutter
  • Ruler
  • Rubber hammer
  • Comfy knee pads

Working time:

Depending on the installation area, it may take approximately 4-6 hours.

Total time:

The total time is highly dependent on the size of the project but it may take around 2-3 days to finish the installation work.

Project cost:

The cost for a floating floor installation could be approximately $1200 if you have a 200 square feet room.

The cost could be around $1200 for a 200-sq-ft room if you opt for a floating installation method.

Materials Needed-

You will need engineered hardwood floor planks, tongue and groove glue (depending on the product), moldings, and floor transitions for this method.

How to Install Floating Engineered Hardwood (Steps)?

Step 1- Underlayment

For the installation of a floating floor, it is essential to utilize an underlayment specifically designed for engineered hardwood floating floors. Ensure that the underlayment has a minimum thickness of 1/8″ and a density of 2.0 inches. This will provide the necessary support and cushioning for the flooring installation process.

Step 2- Expansion Gap

It is crucial to maintain a minimum 1/2″ expansion gap around the perimeter of the room, as well as, around any fixed vertical objects such as cabinets, counters, fireplace hearths, pipes, and doorframes. This gap allows the engineered hardwood floor to expand and contract naturally, preventing potential issues such as buckling. Failing to leave an adequate expansion gap can compromise the integrity of the flooring.

Step 3 – First Row Installation

It’s time to install the first row, so you have to install it by using glue on every plank end, with the tongue facing in the room’s center.

Step 4 – Additional Row Installation

Install the additional rows from left to right. You should put the glue to the seams of tongue-and-groove. Connect the pieces, meticulously folding and taping the new piece to rest over the subfloor. Then, wipe away the glue that squeezes through the boards. Some types of engineered hardwood flooring feature a click-lock design, eliminating the need for glue during a floating installation. This differs from tongue-and-groove products.

Step 5- Final Row Fitting and Installation-

To determine the correct cut for the last row of boards, measure from the board itself (excluding the tongue) to the wall and subtract the expansion gap. When inserting the final row of flooring, ensure that the proper extension gap is maintained between the last piece and the wall.

Step 6- Tape Removal

After 8-10 hours, take off the painter’s tape but steer clear of furniture placement and high foot traffic for 24 hours.

Step 7- Transition and Molding Installation

Once you have completed the new floor, you have to install transition pieces and eliminate the spacers. Then nail the shoe molding and baseboards to the wall.

Method 2: Glue-Down Installation

The glue-down method of installation is well-suited for high-traffic areas, providing increased permanence to your flooring. In this method, the adhesive is evenly spread on the subfloor before placing and securing the planks, ensuring the floor remains firmly in place. This approach offers enhanced sturdiness and stability, making it an ideal choice for areas that experience heavy foot traffic.

Tools Required-

  • Measuring tape
  • Tile cutter or table saw
  • Notched flooring trowel
  • Pen
  • Rubber mallet
  • Knee protection gear
  • Protective glasses
  • Gloves
  • Container
  • Tapping block
  • Ruler
  • 1/4″ spacers

Working time

It may take around 2-3 hours (minimum) to finish an entire floor depending on the fitting area.

Total Time

After the installation work, walking should be prohibited for the next 24 to 48 hours.

Project cost

Typically, this method may cost around $2-$5 per square foot.

Materials Required

You will need engineered hardwood floor plank, floor transitions and molding, and flooring adhesive for this method.

How to Install Glue-Down Engineered Hardwood (Steps)?

Step 1-Select A Wall To Start

To ensure a straight and square installation, it is advisable to begin the flooring installation along an exterior wall. This wall is typically more likely to provide a straight reference line for the rest of the room. Start by measuring the width of two planks from the wall and mark the endpoints on each side of the room. Then, use a chalk line to snap a straight guideline between these marks. This guideline will serve as a reference for the first row of planks and help maintain alignment throughout the installation process.

Step 2- Expansion Gap

Place spacers along the walls to establish the expansion gap according to the manufacturer’s instructions.

Step 3- Gluing Small Areas

Apply a small quantity of glue onto the concrete, approximately equivalent to the width of two or three boards. Utilize a trowel to carefully scrape off any excess glue and drips, ensuring a clean separation from the bucket.

Step 4- Spread The Adhesive

To install glue-down engineered hardwood flooring, the first step is to spread the moisture-cured urethane wood flooring adhesive. Use the recommended trowel size specified by the glue manufacturer. It is crucial to apply the adhesive at a 45° angle, ensuring the proper spread on the subfloor for a strong and long-lasting bond. This is important to prevent any loose or hollow spots. It’s worth noting that the trowel should be changed every 2,000 to 3,000 square feet to maintain the effectiveness of the notches and ensure the adhesive is spread evenly. By following these steps, you can achieve a proper and permanent bond for your glue-down engineered hardwood flooring installation.

Step 5- The First Row

Make sure you use a straight board, and elegantly place the first row along the guideline previously established during the subfloor preparation, ensuring that the tongue side of the board faces inward towards the room.

Step 6- The Second Row

Align the groove of the second row with the tongue of the first row, gently tapping the board into position using a rubber mallet and block.

Step 7- Stagger The Joints

To add power to the floor, you must stagger the boards for six inches from all ends. If necessary, utilize a circular or miter saw equipped with a blade specifically designed for engineered wood flooring to cut the first board. When encountering columns or doorways, you have to carefully trim the planks to fit on both sides while ensuring the preservation of the expansion gap.

Step 8- Continue Floor Installation

When reaching the end, pause and leave some gaps to exit the room comfortably without putting weight on the new floor. Make sure you wait for 24 hours to let it dry.

Step 9- The Final Cut

The measurement of the distance between the board and the wall has to be done meticulously. You have to deduct the expansion gap. Next, cut or rip the last row of boards to fit properly. In case the boards are less than 1 inch wide, it’s advisable to apply glue to the tongue of the installed boards. Use a pry bar and a piece of scrap wood to safeguard the wall, and slide the last row into place. Once the new floor is fully installed, proceed to install transition pieces and remove any spacers that were used during the installation process. Finally, nail the baseboards and shoe molding to the wall to complete the project.

Method 3: Nail-Down Installation

For the installation of a nail-down engineered hardwood floor, you should adhere to the same subfloor preparation guidelines mentioned earlier, using underlayment and placing spacers along the edges of the room to ensure the recommended expansion gap specified by the manufacturer. The process of installing the floor using nails is similar to the staple-down method, with the only difference being the type of fastener and the tool used for fastening.

Tools Required-

  • Nail punch
  • Nail gun
  • Pen
  • Protective glasses
  • Knee pads or cushion
  • Tape measure
  • A Ruler
  • Tile cutter or table saw
  • 1/4″ spacers

Working time:

The engineered hardwood flooring nail-down installation method requires at least 6 hours.

Total time:

You are not supposed to place furniture or roam around on the floor for at least 24 hours after the entire installation.

Project cost:

The cost varies from $6 to $20 per square foot via the nail-down installation method.

Materials Required:

You will need engineered hardwood floor planks, floor transitions, moldings, and matching wood putty for this method.

How to Install Nail-Down Engineered Hardwood (Steps)?

Step 1- Choose the Proper Nail Gun

For the nail-down engineering hardwood installation, you should have a suitable nail gun. The nail-down method needs to be perfect so having a proper instrument is necessary. So do your research and find the best one.

Step 2- Start the Installation

Begin installation from a corner of the room, working towards the opposite wall. Leave a small expansion gap (usually around 1/2 inch) between the flooring and the walls to accommodate for expansion. Place spacers along the starting wall to maintain the expansion gap.

Step 3- First Row Nailing Down

When installing the first row of the hardwood floor, position the boards with the tongue facing toward the center of the room. It is recommended to pre-drill the boards before nailing them, using finishing nails placed approximately 1 inch away from the wall. Pre-drilling helps prevent the wood from cracking and makes the overall process easier. After nailing, use a nail punch to countersink the nails slightly below the surface of the board. Fill the resulting holes with matching wood filler. Repeat this process at intervals of 3 to 4 inches along the length of the board.

Step 4- Keep Going With The Next Boards

Use the nails at a certain angle precisely above the tongue using a pneumatic nail gun. To prevent the tongue-and-groove engagement in the succeeding rows from being broken, you have to countersink the nails. And then keep fitting the flooring.

Step 5- Final Row Face-Nail

For the final row, you may need to face-nail the planks since there won’t be enough space to use the nail gun. Pre-drill holes near the grooves and carefully nail them in place using a hammer and finishing nails.

Step 6- Finish Installation

Once you have installed the planks, remove the spacers from the expansion gaps and install baseboards or quarter-round molding to cover the gaps along the walls. Check the floor for any gaps or loose boards and secure them as necessary. After that, clean the floor thoroughly to remove any dust or debris.

Method 4: Staple-Down Installation

For those who prefer staples as an alternative to nails, the staple-down method of installation presents itself. This method closely resembles the process of nailing down engineered hardwood, albeit with slight distinctions. It is worth noting that both the nail-down and staple-down installation techniques necessitate the presence of a plywood subfloor.

Tools Required-

  • Staple gun
  • Nail punch
  • 1/4″ spacers
  • Measuring Tape
  • Comfortable knee pads
  • Safety glasses
  • Pen
  • Table saw or tile cutter
  • Ruler

Working time:

A professional installer typically completes the staple-down installation process in approximately 10-12 hours.

Total time

After the installation, it is necessary to leave the project site undisturbed for a minimum of 24 to 48 hours. This time allows the floor to properly settle and ensures it is ready for heavy traffic or the placement of furniture.

Project cost

The staple-down installation method generally has a project cost ranging from $3.00 to $3.50 per square foot, considering the labor and materials involved.

Materials Required:

To install, you will need engineered hardwood floor planks, floor transitions, moldings, and matching wood putty for this method.

How to Install Staple-Down Engineered Hardwood (Steps)?

Step 1- Select an Apt Floor Stapler

When choosing a floor stapler, consider the product dimensions. For up to 3″ wide and 1/2″ thick, use a 20 gauge stapler with 1″ staples and a 1/8″ crown. For 5″ wide, go for an 18 gauge stapler with 1-1/4″ staples and a 1/4″ crown. For 3/4″ thick engineered planks, use a 3/4″ solid wood flooring nailer/stapler, following the recommended staple size and nailing schedule. Some staplers may require adapters for different wood thicknesses.

Step 2- Secure The First Row

To install the first row, start by pre-drilling and nailing it using finishing nails. Place the nails about 1 inch away from the wall at intervals of 3 to 4 inches. After nailing, use a nail punch to countersink the nails and then fill the resulting holes with wood filler.

Step 3- Stapling The Following Rows

For the second and third rows, use a pneumatic staple gun to drive staples at a 45-degree angle, placing them every 3 to 4 inches just above the tongue of the flooring. It is important to ensure that the staples do not interfere with the tongue-and-groove fit of the additional boards. Once the staples are securely in place, continue installing the flooring according to the established pattern.

Step 4- Secure The Final Rows

For the last one or two rows, it is recommended to use face nails instead of a pneumatic stapler, especially in small spaces where operating the stapler can be challenging. Pre-drill the necessary holes and then use a nail punch to countersink the nails. To hide any marks, fill the holes with matching wood filler, allowing them to blend in with the surrounding wood. This approach will ensure a neat and seamless appearance for your flooring.

Step 5- Reinstall Molding and Affix Transition

After finishing the installation of your new floor, proceed to install transition pieces and remove any spacers that were used during the installation process. Once that is done, proceed to nail the baseboards and shoe molding securely to the wall. This will provide a finished and polished look to your flooring project.

These were the four main techniques to install wood floors. You may choose any one of them depending on your ability, the cost to install engineered hardwood floors, the appearance, installation preference of engineered hardwood flooring, etc. Talk to the experts who know how to install engineered hardwood flooring in the kitchen, stairs, or anywhere you want. They can guide you with the best way to fit engineered hardwood floors.

Few Tips On Installing Engineered Hardwood Flooring

If you choose to do engineered hardwood floor installation on your own and want it to last longer, you need to be very careful with the process and maintenance of the same. Here are a few tips for you to look into-

1. Choose apt flooring material-

There are several main types of hardwood floors available, including pine, oak, cherry, maple, walnut, mahogany, and birch. It is crucial to select the right type that complements your room’s decorating style and fulfills your specific needs. For instance, most of the population prefers oak for formal rooms and remains a popular choice among contemporary homeowners.

2. Immediate cleaning-

If there has been a spillage on planks or subfloor, clean it immediately, regardless of the size. You can use a mild cleaner that doesn’t affect the finish. Make sure the cleaning agent is suitable for the floor.

3. Units or heavy furniture on wood flooring

If you plan to use a floating installation, heavy fitted units or furniture (more than 200kg when loaded) should not be installed on top of, or fixed to Engineered flooring. This can restrict movement causing the floor to peak. It will also void most manufacturers’ warranties.

4. Embrace the natural variation

To achieve a more authentic and visually appealing look, use 2-3 open boxes of flooring at the same time. This allows you to spread the full range of colors found in real wood across your floor. The natural variation adds character and charm to your space.

Inspect each board: Before installing each board, carefully inspect it. Keep in mind that naturally imperfect boards, especially on rustic floors, are not uncommon. By checking each board, you can ensure that you’re using the best ones for your installation.

5. Randomly place joints:

When it comes to placing joints, opting for a random pattern can yield better results. Randomly arranging the joints creates a more seamless and harmonious appearance for your floor. Additionally, it helps to minimize wastage during the installation process.

6. Maintain an unobstructed perimeter:

It is important to ensure that the perimeter of your floor remains unobstructed. To conceal expansion gaps, consider using wood floor accessories like scotia (beading), door bars, and radiator collars. These products provide a neat and finished look while accommodating the natural expansion and contraction of the wood.

7. Avoid underlay for nailing or gluing:

If you are nailing or gluing down an engineered wood floor, it is advised not to use underlay. Underlay is typically used for floating installations and can interfere with the proper adhesion or nailing of the engineered wood floor. Follow the manufacturer’s guidelines and recommendations for the specific installation method.

By following these tips for installing engineered hardwood flooring in, you can enhance the aesthetic appeal and durability of your wood floor installation, creating a beautiful and long-lasting result.

Which Is The Best- Nail-Down, Glue Down, or Floating Engineered Hardwood Floor Installation?

Choosing a hardwood floor for your home or office is a great decision. Nailing, gluing, and floating are popular floor installation methods. Each method has its advantages and drawbacks. Let’s take a closer look at each installation method in this comparative study

The Nail-Down Procedure

Nail-down installation involves attaching the engineered hardwood planks to the subfloor using nails or staples. Here are some key points to note-

Advantages-

  • Stability: Nailed-down floors are highly stable and resistant to movement.
  • Durability: Nailing the planks to the subfloor ensures a strong bond, reducing the risk of boards shifting or coming loose.
  • Natural Sound: Nail-down installations tend to create a solid and natural sound underfoot making it a preferred choice for many.
  • Cost-effective: The most cost-effective and efficient method of installation is nailing down, applicable for both hardwood and engineered hardwood floorboards.

Considerations

  • Subfloor Condition: Nail-down installation requires a solid and level subfloor. Any irregularities or moisture issues should be addressed beforehand.
  • Noise: Nailing can produce some noise during installation, which may be a concern in certain situations.
  • Time and Skill: This method requires more time and expertise compared to other options so you may have to think twice before using this technique.

The Glue Down Process-

Glue-down installation involves applying adhesive to the subfloor and then attaching the engineered hardwood directly to the adhesive. Here’s what you need to know:

Advantages-

  • Firmness: Gluing the flooring


This post first appeared on Best Engineered Hardwood Flooring, please read the originial post: here

Share the post

How To Install Engineered Hardwood Flooring?

×

Subscribe to Best Engineered Hardwood Flooring

Get updates delivered right to your inbox!

Thank you for your subscription

×