Get Even More Visitors To Your Blog, Upgrade To A Business Listing >>

ErgoVSM: A New Tool that Integrates Ergonomics and Productivity

1. Introduction

The history of Lean Manufacturing begins in Japan after World War II as a survival technique that pushed the automobile company Toyota to focus on low-cost production (Khani, Salehi & Sajad, 2018). The publication of the book “The Machine that Changed the World” (Womack, Jones & Ross, 1990) drove the growth of Lean Manufacturing and its acceptance as a highly beneficial practice for companies from different industries (Abu, Gholami, Mat-Saman, Zakuan & Streimikiene, 2019). As time went by, Lean Manufacturing has demonstrated that it can adapt to the changing needs of organizations, which is why it continues to be used (Hernandez-Matias & Vizan-Idoipe, 2013).

There are several application tools within Lean Manufacturing. VSM or Value Stream Mapping stands out among them because it is considered a key element to initiate implementation of the methodology (Madariaga-Neto, 2018). Rother & Shook define VSM as all the actions (both value-added and non-value added) currently required to produce a product (Rother & Shook, 2009). VSM shows the material flows in the company’s processes through a graphic model that illustrates all the productive activities to identify the value chain and detect where the most waste is produced in the process (Hernandez-Matias & Vizan-Idoipe, 2013).

Lean Manufacturing and its application tools aim to reduce or eliminate activities that do not add value (Villaseñor & Galindo, 2007). Addressing the activities identified as waste or non-value-added improves productivity in companies (Leong, Lam, Ng, Lim, Tan & Ponnambalam, 2019). Lean Manufacturing identifies the following activities as waste: overproduction, waiting, transportation, overprocessing, inventories, defects, and unnecessary motion (Santos, Vieira & Balbinotti, 2015). The waste of human talent has been added recently (Wahab, Mukhtar & Sulaiman, 2013).

The goal of Lean Manufacturing does not consider the impact of the changes in processes on the workers (Dombrowski, Reimer & Wullbrandt, 2018). Some studies demonstrate that rigorous application of Lean Manufacturing can be associated with an increase in musculoskeletal disorders (MSD) as well as work stress (Botti, Mora & Regattieri, 2017; Dombrowski et al., 2018; Koukoulaki, 2014). MSD increase is related to repetitive activities or critical postures for the workers that result from applying productive improvements to the processes (Botti et al., 2017). Eliminating inefficient worker motions that are considered not to add value to the product may generate ergonomic risk factors since sometimes these activities represent physical and mental recovery periods for the workers. (André, Heldal & Edwards, 2015; Dombrowski et al., 2018; Koukoulaki, 2014).

By identifying a lack of consideration of ergonomic risks in the rigorous implementation of Lean Manufacturing, as well as the consequences, it could have for the worker (Edwards, Winkel, Laine, Sinervo, Sjovold, Bragadottir et al., 2012), the integration of Lean Manufacturing Ergonomics has been pushed in order to apply the analysis methods that allow identifying ergonomic risks at work (Dombrowski et al., 2018).

The International Ergonomics Association defines ergonomics as the scientific discipline concerned with understanding interactions among humans and other elements of a system and the profession that applies theory, principles, data, and design methods to optimize human well-being and overall system performance (Thatcher & Yeow, 2018). Ergonomics is divided into three fields of specialization (IEA, 2019): Cognitive, which is concerned with mental processes, focusing on mental workload and work stress; organizational, whose relevant topics are the optimization of sociotechnical systems, their structures, policies, and processes; and physical, which is related to the physical characteristics of human beings and the activities they perform.

The purpose of this work is to analyze the recent literature on the application of ErgoVSM technology using a descriptive review to demonstrate its notable benefits, the challenges that come up in its application, and the main tools used for ergonomic analysis, and the methodology used for its implementation.

2. Method

2.1 Search Process and Inclusion and Exclusion Criterion.

A literature review was conducted between May and June of 2020 to identify the works related to the concept or application of the VSM methodology, including ergonomic analysis. The keywords defined for this research are: Ergonomics, Ergonomic, VSM, and Value Stream Mapping. The word Green, which refers to reducing negative environmental impacts and ecologic efficiency improvement, was used as an exclusion criterion. (Zhan, Tan, Ji, Chung & Chiu, 2018). In the last years, the Lean-Green union has become more relevant worldwide because it seeks both operational and environmental efficiency in the processes (Abreu, Alves & Moreira, 2017). The union of Lean Manufacturing tools and the environmental approach is not within our study area; thus, it was defined as an exclusion criterion.

Search keywords and the exclusion criterion are combined using the Boolean operators “OR”, “AND”, “NOT”, as well as the use of parentheses to define the search. They were combined as follows: (“Ergonomic” OR “Ergonomics”) AND (“VSM” OR “Value Stream Mapping”) NOT (“Green”). The language was another exclusion criterion; only articles written in English and Spanish were considered.

In the first stage, the search was conducted using the databases Science Direct, Springer, and Google Scholar (see Figure 1). The title and abstract of each publication were checked as a first filter, and then the full text was analyzed to select the publications to be included. As the last step to complete the search, it was decided to review the references included in the chosen articles to have a full review of the publications.

Figure 1. Flow chart of the research method

2.2. Descriptive Information

Twenty-six products related to ErgoVSM were selected (See Table 1). Eighteen of these products are case studies in which the methodology is applied mainly in the healthcare sector. In contrast, the rest of the studies approach ErgoVSM at a conceptual level, describing the methodology, suggesting its application, or describing the advantages of uniting Ergonomics with the production approach.

3.    Development and discussion

3.1.    Concept and Goal of ErgoVSM

In the literature, the concept of ErgoVSM has not varied significantly since it was defined for the first time in by Mathiassen et al. (2004) as a complement of VSM methodology to highlight ergonomic indicators in production systems. ErgoVSM originates after identifying that both VSM and Lean Manufacturing lack ergonomic considerations in their analyses and only consider indicators that are focused on productivity. This deficiency can result in the intensification of work, which increases the ergonomic risks that lead to worker disability leaves (Edwards, Dudas, Hanse, Harlin, Hegstad, Holte et al., 2009).

Mathiassen et al. (2004)

Article

Type of Publication

Conference Proceeding

Application

Conceptual

Neumann and Winkel (2005)

Jarebrant, Dudas, Harlin, Hanse and Winkel (2009) Edwards et al. (2009)

Jarebrant, Dudas, Harlin, Hanse and Winkel (2010)

Winkel, Birgisdóttir, Dudas, Edwards, Gunnarsdóttir, Harlin et al. (2012)

Edwards and Winkel (2013) Gunnarsdóttir and Birgisdóttir (2013)

Winkel, Dudas, Harlin, Jarebrant and Hanse (2013) Aqlan, Lam, Testani and Ramakrishnan (2013) Edwards (2014)

Jarebrant et al. (2014)

Winkel, Edwards, Birgisdóttir and Gunnarsdóttir (2015)

Winkel, Edwards, Birgisdóttir, Jarebrant, Hanse, Gunnarsdóttir et al. (2015)

Edwards and Winkel (2016a)

Jarebrant, Hanse, Harlin, Ulin, Winkel, Edwards et al.(2016) Hasle, Starheim, Jensen and Diekmann (2016)

Edwards and Winkel (2016b)

Jarebrant, Winkel, Hanse, Mathiassen and Birgitta (2016) Edwards (2017)

Suryoputro, Sari, Burhanudin & Sugarindra (2017) Kim (2017)

Arce, Romero-Dessens and Leon-Duarte (2018) Pereiro da Silva and Goncalves-Amaral (2019)

López-Acosta, García-Vilches, Velarde-Cantú and Chacara- Montes (2019)

Sakthi, Jeyapaul, Vimal and Mathiyazhagan (2019)

Journal Article Conference Proceeding Conference Proceeding Conference Proceeding

Conference Proceeding

Conference Proceeding Conference Proceeding Conference Proceeding Conference Proceeding Conference Proceeding Conference Proceeding Journal Article

Conference Proceeding

Conference Proceeding Book

Conference Proceeding Conference Proceeding Journal Article Conference Proceeding Conference Proceeding Journal Article Conference Proceeding Conference Proceeding

Journal Article

Journal Article

Conceptual Conceptual Conceptual Conceptual

Conceptual

Hospital Hospital Hospital

Electronics Industry Hospital

Hospital Conceptual

Hospital

Hospital Conceptual Hospital Hospital

Automotive Industry Conceptual

Musical Instrument Industry Conceptual

Electronics Industry Hospital

Food Industry

Textile Industry

Table 1. List of articles that applied ErgoVSM, as well as their conceptual description

Ergo VSM focuses on the VSM participatory tool (Winkel, Edwards, Birgisdóttir, & Gunnarsdóttir, 2015) by encouraging the inclusion of people from all work groups and seeking the active cooperation of the staff to identify areas of opportunity and improvement ideas that should be deployed around the organization (Jarebrant, Hanse et al., 2016).

Regarding the terms utilized to refer to this tool, ErgoVSM predominates in 19 of these products, as the concept introduced by Mathiassen et al. (2004). The concept ERGONOVA is used by Jarebrant et al. (2009) and Edwards et al. (2009), and in subsequent studies, it is standardized with the name ErgoVSM. The rest of the works utilize very similar concepts, such as Ergonomic Value Stream Map (Aqlan et al., 2013), VSM with ergonomic evaluation (López-Acosta et al., 2019), and the singular name P-lean, named as such because it uses lean tools (VSM) that focus on improving the psychosocial factors of the work environment (Hasle, Starheim, Jensen, Diekmann & Jensen, 2016).

The goal of ErgoVSM is to complement the analysis carried out with VSM by adding evaluations of the ergonomic consequences that arise in workers due to the current production flow (Mathiassen et al., 2004). This integration of Lean Manufacturing and Ergonomics seeks to develop sustainable flows in the process (Edwards & Winkel, 2016b). ErgoVSM allows focusing on achieving greater efficiency, improving the work environment, and reach a sustainable work-life (Neumann & Winkel, 2005). The methodology contributes to evaluating and drawing attention to the ergonomic risks that can happen when processes are improved (Jarebrant, Winkel et al., 2016), as well as to facilitate the participation of the workers in the evaluation of the current and future state of the process (Jarebrant et al., 2009).

3.2.     ErgoVSM Methodology

The Rother & Shook methodology (see Figure 2) is the most used for applying VSM in organizations (Faulkner & Badurdeen, 2014). Therefore Jarebrant, Hansen et al. (2016), Jarebrant, Winkel et al. (2016), Suryoputro et al. (2017) and López-Acosta et al. (2019) work based on these four main steps to apply ErgoVSM: preparation; map current state; define future state; and design and execute the action plan. Below is a description of each of these stages.

Figure 2. Workflow of the ErgoVSM Methodology Stages

Preparation: It is the essential part of the process because it ensures a successful outcome. It is where the focus of the project is determined (Suryoputro et al., 2017). This stage requires the commitment of the organization at all levels to carry out the project and select the flow to be mapped, as well as integrate the multidisciplinary work team (Jarebrant, Hanse et al., 2016).

Current state mapping: This stage is where operations are analyzed using VSM to know the current situation of the processes, including the ergonomic tools selected (López-Acosta et al., 2019). The estimated time that activities take must be identified, the ergonomic evaluation must be carried out, data must be gathered, areas of opportunity must be identified, and improvement ideas must be developed (Jarebrant, Winkel et al., 2016).

Future state definition: Based on the issues identified in the current state, solutions that integrate Ergonomics must be created in the future state. In case this does not happen, improvement ideas must continue (Jarebrant, Hanse et al., 2016). It is vital to integrate the ergonomic improvement ideas in future VSM, as well as consider the economic risks that can arise due to changes (López-Acosta et al., 2019). Rother & Shook emphasize that, once the current state begins to be mapped, future state ideas will emerge; this is why the arrows go both ways (see Figure 1). Sometimes the distinction between one step and the other will become so blurred that they may begin to happen simultaneously (Rother & Shook, 2009).

Design and execution of improvement plan: It is necessary to establish an implementation schedule for each action (Jarebrant, Winkel et al., 2016), to achieve the desired future state. When making changes to the process, activities in the workstations must be evaluated to verify the changes and how they affect workers (López-Acosta et al., 2019).

Lean Manufacturing and its application tools continuously look for new ways to carry out tasks in more agile, flexible, and economical ways (Hernandez-Matias & Vizan-Idoipe, 2013). In VSM, to achieve this desired continuous improvement, it is important that when the future state becomes a reality (current state), the future state stream map is drawn again in order to start the value chain improvements anew (Rother & Shook, 2009).

Sakthi et al. (2019) propose the following implementation stages: a) Preparation, b) Current state mapping,

c) Definition of the improvement plan, d) Execution of final plan, e) Evaluation of the results obtained after implementation of the improvement plan, f) Identification of learnings and g) Continue with the continuous improvement cycle.

Both present methodologies similarities in the first two steps, coinciding in the importance of preparing the project and selecting key indicators and team members. After building the current state, Rother and Shook (2009) indicate that an analysis of the information gathered must be carried out to define the desired future state before making changes to the processes, while Sakthi et al. (2019) opted for defining the improvement plan after building the current state of the process based on the data obtained and the areas of opportunity identified while mapping the current state.

This change by Sakthi et al. (2019) that consists of not defining the future state stands out against the importance that Rother & Shook (2009) give to defining the desired future state by considering it the guideline that helps define improvement actions that will help us get closer to what the value flow should be. Jarebrant, Hanse et al. (2016) emphasize the importance of evaluating the future state before implementing the changes to know if the desired indicator improvements will be achieved and present the future state mapping to all the workers to help generate more improvement ideas and ensure the staff’s participation in the action plan.

3.3.     Distribution by Country, Year, and Type

The countries that make up the Nordic council stand out notably for their contributions with 19 products between Denmark, Iceland, and Sweden (see Figure 3). Additional to the countries mentioned above, this council is made up of Finland, Norway, the Faroe Islands, Greenland, and Åland, and their goal is to make this region the most sustainable and integrated of the planet (The Nordic Council and the Nordic Council of Ministers, 2018). ErgoVSM is identified as a recently discovered tool outside of the Nordic council, and it started to be used in 2013 in countries such as Brazil (Pereiro da Silva & Goncalves-Amaral, 2019), United States (Aqlan et al., 2013), United Arab Emirates (Kim, 2017), Indonesia (Suryoputro et al., 2017), India (Sakthi et al., 2019) and Mexico (Arce et al., 2018; López-Acosta et al., 2019).

Even though Ergonomics has worked along with other sciences such as engineering or medicine since 1970 (Obregon-Sanchez, 2016), and the VSM methodology became popular in 1998 in the western countries (Madariaga- Neto, 2018), most of the publications about ErgoVSM are more recent, from 2010 to 2019 (see Figure 4), so the

methodology can be considered new. The works conducted in this area have been mainly presented at conferences, less often published in research journals, and there is only one book on the ErgoVSM methodology (Figure 4).

Figure 3. Distribution of products by country

Figure 4. Distribution of products by year and type of publication

3.4.     Ergonomic Instruments Applied

The instruments used for the ergonomic risk analysis module can be divided into those developed by the researchers themselves for the study and those that used instruments that are recognized and validated by the industry (See Table 2). The physical and psychosocial risk analysis set is the one with the most products compared to the separate studies of physical, psychosocial, or cognitive risks.

Physical risk factors are those related to repetitive tasks, load weight, and posture (Otto & Battaïa, 2017). Psychosocial factors refer to the work conditions relating to work organization and work environment (Fernandes, Figueiredo, Ribeiro, Neves & Vicente, 2020). Cognitive risk factors focus on the mental load of the work, mainly stress (Kim, 2016).

Risk factors, both physical and psychosocial, have become an object of study for the application of ErgoVSM within the Nordic council due to physical and mental burnout issues detected in healthcare workers (Edwards et al., 2009). These studies (Edwards, 2014; Edwards & Winkel, 2013; Jarebrant, Winkel et al., 2016; Winkel, Edwards, Birgisdóttir, Jarebrant et al., 2015) were led mainly by ergonomists who worked on the analysis instrument applied for more than ten years at different hospitals to improve it according to their observations. Said instrument was presented in the 2016 book Ergonomic Value Stream Mapping (Ergo VSM), Tool and User Guide (Jarebrant, Hanse et al., 2016).

The analysis of ergonomic factors in the industrial sector mainly used already known instruments that focus on identifying risk loads or postures for workers (Aqlan et al., 2013; López-Acosta et al., 2019; Suryoputro et al., 2017). Aqlan et al. (2013) stand out to develop a comfort survey for workers that touches on posture, load, noise, temperature, vibration, and lighting. Arce et al. (2018) focused on analyzing mental workload factors in the industry, and Hasle, Starheim, Jensen and Diekmann (2016) identified communication problems in the organization that reflected psychosocial factors.

Table 2. Types of instruments applied, and ergonomic factors analyzed in ErgoVSM

3.4.1.     Application in Hospitals

ErgoVSM application studies have been carried out mainly in the healthcare sector, focusing on hospitals. The applications were in Nordic countries, except for the Pereiro de Silva & Goncalves-Amaral (2019) research carried out in Brazil. They implemented the method indicated in the book “Ergonomic Value Stream Mapping (Ergo VSM), Tool and User Guide” (Jarebrant, Hanse et al., 2016) and reached the identification of areas of opportunity phase (Pereiro da Silva & Goncalves-Amaral, 2019).

The application of Lean Manufacturing tools in the healthcare sector, known as Lean Healthcare, begun in 2001 by helping to eliminate unnecessary processes or duplicates that extended patient stays (Radnor, Holweg & Waring, 2012). Lean Healthcare demonstrated to have positive impacts when focusing on the services that patients receive (Spagnol, Min & Newbold, 2013).

The application of Lean Healthcare in the Nordic healthcare system gained strength after creating the NOVO Network in 2006 (Winkel, 2009). The goal of the NOVO Network is to create sustainable healthcare systems (NOVO, 2020). By identifying the possible ergonomic physical and psychosocial risks to which healthcare workers

are exposed, they proposed implementing an ErgoVSM (Jarebrant et al., 2009; Winkel, Edwards, Birgisdóttir, Jarebrant et al., 2015).

The first applications of ErgoVSM in Nordic hospitals happened in 2013 (Edwards & Winkel, 2013; Gunnarsdóttir & Birgisdóttir, 2013; Winkel et al., 2013). The study aims to compare the results obtained between VSM and ErgoVSM (see Table 3). Two independent teams participated in the studies, one for VSM and the other for ErgoVSM. A more significant number of improvement ideas, as well as a lower negative ergonomic impact was identified in the ErgoVSM room proposals.

Winkel, Edwards, Birgisdóttir, Jarebrant et al. (2015) conducted a study with a greater number of hospital rooms to compare ErgoVSM against VSM (see Table 3), following the same principle of the previous studies, 50% of the rooms applied VSM, and the rest applied ErgoVSM. One result that stands out is that the rooms with ErgoVSM work teams participated on average 8% more than the VSM teams. It was also found that ErgoVSM room participation offered a 96% positive ergonomic impact on the worker compared to 84% in VSM rooms.

Table 3. Comparative of VSM against ErgoVSM in hospital ward

3.4.2.      Application in the Industrial Sector

The application of ErgoVSM in the industrial sector consists of six analyzed products. The industries included with one case each are: textiles, food, automotive, manufacturing of musical instruments. The electronics industry has two case studies, this is the highest application recurrence.

The ergonomic module in the industrial sector has focused on identifying physical risk factors related to worker posture and load (See Table 4), mainly using recognized tools that have been previously applied in the industrial sector (Aqlan et al., 2013; López-Acosta et al., 2019; Suryoputro et al., 2017). The psychosocial and physical factors of the workers were analyzed to a lesser degree (Jarebrant, Winkel et al., 2016; Sakthi et al., 2019), and only one of the products evaluated the cognitive factors related to mental load (Arce et al., 2018).

One of the most-used methods in the ergonomic risk analysis literature is REBA (Boulila, Ayadi & Mrabet, 2018), which focuses on evaluating the position of the body of the person carrying out the task (Enez & Nalbantoğlu, 2019). Suryoputro et al. (2017) applied the method and included the scores obtained in each ErgoVSM process. López-Acosta et al. (2019) used REBA and complemented it with physical analysis methods such as Brief, NIOSH, and MAC.

The use of information technology programs for ergonomic risk analysis is present in the studies by López-Acosta et al. (2019) with the Ergo/IBV software, which allows evaluating repetitive movement risks, while Aqlan et al. (2013) used the Jack software to model the ergonomic risks proposed for the processes.

Table 4. Articles that include ergonomic analyses and the methods used

A study that provides a precedent of ErgoVSM and the application of Lean Manufacturing tools with an ergonomic approach is the one carried out by Aqlan et al. (2013). However, even though the application of an ergonomic value stream map is mentioned, the information shown does not entirely coincide with the characteristics of VSM. The mapping shown is more similar to the characteristics of a flow chart. It is important to remember that the goal of VSM is to show all the actions that are carried out to produce a product, not only the individual processes (Rother & Shook, 2009), while the flow chart helps us represent the order of operations in a given process (Cuatrecasas, 2010).

The methodology applied mainly in the Nordic healthcare sector was adapted to the automotive sector by Jarebrant, Winkel et al. (2016), comparing the results after forming three independent work teams, one of them applying the VSM methodology and two of them und ergoVSM. The results obtained show that both VSM and ErgoVSM can achieve similar production performance results, but only ErgoVSM teams included improvements regarding work conditions (Jarebrant, Winkel et al., 2016).

Sakthi et al. (2019) developed a physical and psychosocial analysis instrument and applied it in the textile sector in collaboration with Lean Manufacturing and Ergonomics experts. The instrument was validated by applying it to a sample and carrying out a reliability test. Sakthi et al. identify a lack of indicators focused on the security and hygiene of the workers who also contribute to the performance of activities as a limitation of the instrument.

3.5.     Lean Manufacturing Tools Used

Lean manufacturing has different tools to achieve continuous improvement, which can be applied independently or together, depending on the needs detected in the organization of the study (Hernandez-Matias & Vizan-Idoipe, 2013). The application of ErgoVSM in the industrial sector has been implemented in 80% of the cases using Lean Manufacturing tools (see Table 5), while the healthcare sector does not indicate the use of more continuous improvement tools.

Aqlan et al. (2013)

Industry

Electronics

Lean Tool

  • SIPOC (Analysis)

López-Acosta et al. (2019)

Arce et al. (2018)

Sakthi et al. (2019) Suryoputro et al. (2017)

Food

Electronics Textile

Musical Instruments

  • Cause and effect diagram (Analysis)
  • Kanban (Application)
  • Kaizen (Application)
  • Poka-yoke (Application)
  • SIPOC (Analysis)
  • Kaizen (Application)
  • Gemba Walk (Analysis)
  • 3P (Application)
  • Gemba Walk (Analysis)
  • Considers ergonomic risk factors as the ninth waste.

Table 5. Lean Manufacturing tools used in ErgoVSM

The tools that were used the most were the SIPOC diagram (Aqlan et al., 2013; López-Acosta et al., 2019), and Gemba Walk (Arce et al., 2018; Sakthi et al., 2019), which were used to complement ErgoVSM in the current state mapping stage, which helps to know the processes and identify production problems. Kaizen was mainly used in the step corresponding to designing and executing the improvement plan (Arce et al., 2018; López-Acosta et al., 2019).

The SIPOC tool is a process diagram that identifies suppliers, inputs, process, outputs, and customers (Gutiérrez & de la Vara, 2013). The application of SIPOC allowed López-Acosta et al. (2019) and Aqlan et al. (2013) to know the manufacturing process and identify and analyze the ergonomic risks of the activities performed.

Gemba Walk refers to seeing the actual process or the production area in this case (Flumerfelt & Wenson, 2019). Sakthi et al. (2019) used it as the first step to collect data, observe the process, and interview the production workers. Arce et al. (2018) applied Gemba Walk to identify areas for improvement in the processes. These applications highlight the importance that Imai (2012) gives to being present in the workplace and then apply continuous improvement.

The most used tool to design and execute the improvement plan is Kaizen, a Japanese word that has been generally translated as a continuous improvement (Imai, 2001). The application by López-Acosta et al. (2019) and Arce et al. (2018) focused on creating Kaizen team works to solve areas of opportunity in the process. Previous applications of Lean Manufacturing tools in ErgoVSM demonstrate the adaptation of this production system to achieve better situations that focus either on productivity or ergonomic risks.

An approach that goes beyond complementing Lean Manufacturing tools with Ergonomics is that of Suryoputro et al. (2017) considers ergonomic risks as another type of waste within lean manufacturing, so these risk factors must be reduced or eliminated just like all traditional waste in the methodology. Including a new waste approach is a topic also developed by Dombrowski et al. (2018) and Dombrowski, Reimer and Stefanak (2019), by considering that avoiding waste from the customer point of view is not enough, that worker health must be included in the goals, and that due to musculoskeletal disorder increase, an inclusive and sustainable work design is required.

3.6.     Benefits of ErgoVSM application

Among the benefits of applying ErgoVSM that were identified, one that stands out is the union it achieves between improvement activities by considering the ergonomic conditions of the workers and the key productivity indicators, thus obtaining ergonomic improvements that do not affect operational performance and successfully encourage process improvement (Jarebrant, Winkel et al., 2016). The adaptation of ErgoVSM has demonstrated that it reduces the negative effects that the application of Lean Manufacturing can have on the quality of life of the workers (Sakthi et al., 2019).

Analyzing the ergonomic risks before implementing an improvement plan avoids the intensification of activities and encourages discussion and the contribution of ideas by the staff (Jarebrant, Hanse et al., 2016). The union of Ergonomics and VSM offers the possibility of improving communication and coordination issues, thus ensuring the participation of the workers in implementation (Hasle, Starheim, Jensen, & Diekmann, 2016). Applying the ErgoVSM methodology facilitates the analysis of ergonomic issues in the processes (Edwards & Winkel, 2016b) and identifies the intensification of work after an improvement (Westgaard & Winkel, 2011).

Using ErgoVSM helps us achieve sustainable systems (Jarebrant et al., 2010; Jarebrant, Winkel et al., 2016). In the Nordic health sector, sustainability has been defined as achieving efficiency in patient care, improving the work environment in healthcare organizations, and complying with patient care quality standards (Sinervo, Laine & Pekkarinen, 2013).

3.7.     Challenges

Most of the challenges found for the implementation of ErgoVSM in an organization stem from the application of traditional VSM. This is evident because ErgoVSM is a tool that complements VSM. It should be emphasized that there must be a commitment and responsibility of the management, as well as constant effort and a strong conviction to be able to adapt the methodology to the selected process (Rother & Shook, 2009).

Lack of communication and coordination in the tasks to be completed by different groups or departments result in the work team losing the focus to solve problems or considering that the situation cannot be changed (Hasle, Starheim, Jensen, & Diekmann, 2016). Implementing a multidisciplinary team is recommended to allow achieving an analysis based on the knowledge of the activities carried out by all the teams (Jarebrant, Hanse et al., 2016). On the other hand, work teams must have responsibility, participation, and focused leadership in order to be able to achieve the appropriate changes; if this is not present, the possibilities of successfully implementing the tool decrease (Jarebrant, Hanse et al., 2016).

When comparing the challenges between the application of ErgoVSM and VSM, it is evident that the current state of the process stage takes more time when applying ErgoVSM compared to traditional VSM (Jarebrant, Winkel et al., 2016), since ergonomic data gathering requires more time and analysis. Despite this, the value of these data for decision-making by the management justifies the extra time (Sakthi et al., 2019).

4.    Discussion

ErgoVSM originates from the need to have tools that increase ergonomic conscience and consider both Ergonomics and productivity in process planning (Mathiassen et al., 2004). ErgoVSM studies are regarded as a novel because the publications found were from 2004 to 2019, and the number of publications was reduced compared to Lean Manufacturing and environmental (Lean-Green) studies, which have become popular in recent years (Farias, Santos, Gohr., Oliveira & Amorim, 2019; Siegel, Antony, Garza-Reyes, Cherrafi & Lameijer, 2019; Zhan et al., 2018).

Even though Lean Manufacturing was born in the industrial sector (Fercoq, Lamouri & Carbone, 2016), the application of ErgoVSM has happened mainly in the healthcare sectors of Nordic countries. It is related to the push that the NOVO Network has given to creating sustainable healthcare systems in the region (NOVO, 2020). Sustainable is defined as achieving efficiency in medical care, improving the work environment, and complying with patient care standards (Sinervo et al., 2013).

In countries such as Mexico, India, and Indonesia, which are considered countries with emerging economies (Wu, Chen, Chen & Jeon, 2020), ErgoVSM applications focused on the manufacturing industry, which coincides with the characteristics of this type of economies that seeks economic growth by focusing on industrialization (Onyiriuba, 2016). On the other hand, economies regarded as developed, such as Sweden and Denmark (Li & Lin, 2019), focused on improving the conditions of the healthcare sector, which coincides with the peculiarities of developed countries that focus on improving the quality of life of their inhabitants (Onyiriuba, 2016).

In the healthcare sector, ErgoVSM applications have focused mainly on considering both the physical and psychosocial factors by applying instruments developed by the authors themselves, while the industrial sector has

focused on analyzing the physical factors using tools that are already known in the industry. Since it has been identified that the negative effects of the application of Lean Manufacturing can appear in both physical and mental factors (Koukoulaki, 2014; Pereiro da Silva, Tortorella & Goncalves-Amaral, 2016; Westgaard & Winkel, 2011), it is considered necessary to include instruments that help ergonomic, physical, and psychosocial analysis.

It was identified that ErgoVSM requires more build time than VSM due to the amount of extra data needed (Sakthi et al., 2019). Rother & Shook (Rother & Shook, 2009) estimate that building the current and future VSM for a family of products should conclude after two days of work, to then start to execute the improvement plan. Jarebrant, Winkel et al. (2016) compared ErgoVSM against VSM regarding the time required to build them, demonstrating that VSM took 18 hours of work against 24 hours required by ErgoVSM for the same production process. Even though ErgoVSM required more time, Sakthi et al. (2019) proved that the results of the methodology justify the additional time invested. Jarebrant, Winkel et al. (2016) concluded that the extra hours invested in ErgoVSM are reasonable because they yield positive results by improving the ergonomic conditions of the workers without negatively affecting productivity.

The inclusion of a greater amount of Lean Manufacturing tools in ErgoVSM happened mainly in industrial sector applications, while the healthcare sector focused on developing and improving ErgoVSM. Among the main Lean Manufacturing tools that were not used are 5S, which is considered key in implementing Lean Manufacturing and work environment improvement for being a tool that focuses on order, cleanliness, and discipline (Villaseñor & Galindo, 2007). Bhattacharya et al. (Bhattacharya, Nand & Castka, 2019) indicate that the application of 5S can improve the security and hygiene conditions of the workers.

5.    Conclusion

The ErgoVSM methodology has been demonstrated to be an essential technique to improve the productive and ergonomic conditions of the processes, allowing to identify the areas of opportunity in industrial or healthcare processes. The extra time required for the construction of an ErgoVSM should be considered as an investment that will allow to improve the processes in an integral way.

Most of the studies analyzed to consider the physical and psychosocial factors of the workers. An area of opportunity that was identified to strengthen ErgoVSM was including factors relating to the physical environment of the workers, such as noise, temperature, and lightning, which affect not only the health of the workers but also their performance in the workplace. Including physical environmental conditions in the methodology will allow us to better to identify integral improvements in process and activity design.

The application of the ErgoVSM in different economic sectors will help in the inclusion of a greater number of ergonomic instruments, depending on the nature of the activities carried out by the employee, which allow us to make comparisons and evaluations of the results obtained. Having more case studies can encourage those responsible for designing and improving processes in the workplace to apply an ErgoVSM for decision-making. It is suggested the application in those activities recognized for the ergonomic risk for employees either due to the characteristics of their physical environment, the activities carried out by the employee or their identified psychosocial demands should be a priority.

Acknowledgements

The authors are grateful to the Universidad Autónoma de Baja California for facilitating access and use of their facilities and equipment to carry out this research.

Declaration of Conflicting Interests

The authors declared no potential conflicts of interest with respect to the research, authorship, and/or publication of this article.

Funding

The authors received no financial support for the research, authorship, and/or publication of this article.



This post first appeared on Six Sigma Training And Certification In Bangalore, please read the originial post: here

Share the post

ErgoVSM: A New Tool that Integrates Ergonomics and Productivity

×

Subscribe to Six Sigma Training And Certification In Bangalore

Get updates delivered right to your inbox!

Thank you for your subscription

×