I have always done my residential electrical work myself (with permit + inspection). Never had any problems. Now planning a net metering Install, and I have some questions specifically with regard to ESA inspection (such as where to locate the rapid shut down box (on the roof?), can I install the inverter inside, and specific wording for placards on the equipment and the panel). Anybody any recent experience and/or photos that they want to share?