Case Study: SolarEdge7600 Energy Production

A 10.2 kW system using the SolarEdge 7600 Inverter was evaluated to compare the actual production against the production estimates produced by the layout design tool. The system evaluated was commissioned to operate since February, so the production values were compared from February to June of the year 2016.

The results show that the estimates are very close to the actual production values. The system produced about 3.5% more than the estimates show overall in the time period from February to June. The results also show that the system actually produces about 3.5% percent more overall than the estimates in the PV layouts. This shows that the estimates attained via the PVWatts government website through our design tool are indeed accurate. The case study also shows that the SolarEdge 7600 Inverter is capable of handling a 10 kW system.


Equipment:

40x Gigawatt 255W Solar Panels


40x Solaredge P300 Power Optimizers


1x SolarEdge 7.6kW Inverter w/ Zigbee Wireless Monitoring

Location: Camaloa Avenue,Lake View Terrace CA 91342



This post first appeared on Solar Industry News & Tips On DIY Solar PV Systems, please read the originial post: here

Share the post

Case Study: SolarEdge7600 Energy Production

×

Subscribe to Solar Industry News & Tips On Diy Solar Pv Systems

Get updates delivered right to your inbox!

Thank you for your subscription

×