The Grid Access Unit of South African power utility Eskom has praised the efforts of juwi and Sonnedix for their successful connection to the grid of the Mulilo-Sonnedix-Prieska PV project, which is believed to be the first PV project under the REIPP to gain grid code compliance before reaching Commercial Operation.