The plan was to convert to the new smart meter but, the old one was blocked in and there was no way to remove it. Also, the old style wiring means that half the street is electrically connected and to install a new meter safely, 30 houses would need to switch off their electric supply for a few hours. The new smart meter went back in the van.
www.flickr.com/photos/johngarghan
#PhotoADay #project365 #365project #virtualartgallery #ElectricSmartMeter