Get Even More Visitors To Your Blog, Upgrade To A Business Listing >>

Project-Based Learning Is Just the Beginning

A district is preparing its students for the future by focusing on the skills and connections students will need in their careers.

By Felice Hybert

Having a job may seem a lifetime away for a child, but by exposing them to different Career paths, we can get them thinking about their life after high school and better prepare them for their lives after graduation.

Three years ago, we transformed Kankakee Public Schools’ general education track into the College and Career Academy, which is 100% focused on using PBL to prepare students for future jobs. We’ve introduced 16 different career paths to about 70% of our K–5 students using Defined STEM’s career wheel. Each grade has a designated career cluster they focus on, and as students move through the grades, they explore a wide variety of career opportunities.

In addition, we are one of 10 high school districts in Illinois that has started to move to competency-based learning. We’re also working to report on students’ mastery of skills with progress levels, rather than a traditional report card at the end of each semester. We started by marrying the traditional, content-driven course work with performance-based assessment. Rather than having teachers manage a whole group of 30+ students at once, PBL frees them to break classes into small groups and connect and talk in depth with each group.

As we make our way toward a completely mastery-based model, we are slowly ridding ourselves of traditional grade levels. Instead, we aim to categorize students by year one, year two, and so on. If a child can demonstrate mastery of a certain content area, they can move on in their work—even if they are technically a freshman. We have also increased dual-enrollment options, providing our junior and senior students opportunities to take local community college classes, which has played a significant role in giving our students a taste of real-world jobs once they have displayed mastery.

For example, we have a partnership with a local health clinic in the district where Students Interested in medical studies can learn necessary skills for a career in that field. We’ve also had local conferences where students interested in areas like PR and public speaking interview with workforce readiness programs and learn from employees about what it takes to succeed in a full-time job.

Since we implemented our PBL and competency-based model, data shows that in one year (2016 to 2017), reading comprehension scores increased 8% and math application increased 9%. We have also seen an increase in student engagement in all of our K–6 classes, and have continued to build partnerships with local businesses and industries that support students’ exploration and curiosity about future career options.

Editors Note: This article was originally posted on Tech & Learning.  Click here for original post. 

The post Project-Based Learning Is Just the Beginning appeared first on Defined STEM.



This post first appeared on Defined STEM Educators, please read the originial post: here

Share the post

Project-Based Learning Is Just the Beginning

×

Subscribe to Defined Stem Educators

Get updates delivered right to your inbox!

Thank you for your subscription

×